HYSSOP

BCC Contracting, Inc. completed the construction of this stand-out 42,875 square foot industrial concrete tilt-up building for Chase Partners, LTD in the City of Rancho Cucamonga. Total construction time was 6.5 months from kick-off to completion. This building is situated on 2.03 acres and features 4,667 square feet of two-story offices and restrooms, 28′ minimum clearance, ESFR Sprinkler System, LED lighting, 2 ground-level doors, 2 dock-high doors, 134′ secured concrete-truck court with gated truck entrances, 800 amps electrical service, and great access to 1-15, 10 & 60 Freeways.

Client: Chase Partners, LTD

Charles Smith

BCC Contracting, Inc. completed the construction of this tastefully designed 27,870 square foot industrial concrete tilt-up building for Chase Partners, LTD in the City of Rancho Cucamonga. This building is situated on 1.30 acres and features 1,740 square feet of office with a bonus mezzanine, 24′ minimum clearance, ESFR Sprinkler System, LED lighting, 1 ground-level door, 1 dock-high door, secured concrete-truck court with gated truck entrances, 800 amps electrical service, and great access to 1-15, 10 & 60 Freeways.

Client: Chase Partners, LTD

Kline Ranch

BCC Contracting, Inc. completed the construction of this beautiful 86,423 square foot industrial concrete tilt-up building for Alere Property Group in the City of Rialto. Total construction time was 8 months from kick-off to completion. This building is situated on 5.08 acres and features 1,994 square feet of office space, 32′ minimum clearance, ESFR Sprinkler System, LED lighting, 1 ground-level door, 12 dock-high doors, 4 knock-out panels, secured concrete-truck court with gated truck entrances, 12 additional trailer parking positions, 1,200 amps electrical service, and great access to 1-10, 60 & 215 Freeways.

Client: Alere Property Group

American Sanitary

BCC Contracting, Inc. completed the construction of this breath-taking 24,600 square foot industrial concrete tilt-up building for American Sanitary Supply in the City of Anaheim. Total construction time was 6.5 months from kick-off to completion. This building is situated on 0.84 acres and features 5,000 square feet of two-story office space, 28′ minimum clearance, ESFR Sprinkler System, LED lighting, 1 ground-level doors, 2 dock-high doors, fully secured concrete-truck court with gated truck entrances, 400 amps electrical service, and great access to I-5, 91, 55 & 57 Freeways.

Client: American Sanitary Supply

Susan Street

BCC Contracting, Inc. completed the market ready tenant-improvements to this 93,955 square foot industrial concrete tilt-up building for Alere Property Group in the City of Santa Ana.

Client: Alere Property Group